|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SpeedLiner ®
The professional pipe restoration process
By means of the new SpeedLiner®
process, sewage plumbing with a diameter of DN 50 to DN 600
can be restored with a mobile unit on site.
The extreme mobility as well as the flexibility of the SpeedLiner®
Systems requires only a short period of time for the construction
site installation. The neighbourhood as well as the traffic in the vicinity
will only be slightly affected, if at all.
By using the SpeedLiner® System, you have the possibility
of carrying out the impregnation and calibration on site. With various
liners cut to the exact specifications of the pipe work to be restored,
you will be in a position, at all times, to produce the best
quality within the shortest period of time in a controlled and guarded
environment. Fast and efficient and with a minimum of manpower
costs, the inverse technique, which is easy and uncomplicated to use,
allows the saturated liner to be inserted into the drain or pipe work
that needs to be refurbished. During mixing, calibrating and hardening,
all parameters will be regulated in real time, controlled and recorded
in order to vouch for the built-in-quality to the client with clean documentation
after operation.
|
|
|
The SpeedLiner® technique can be trained easily and within a short time period at our Training Centre or on site by our qualified staff.
|
© Linersystem GmbH, Schlieren - No liability assumed.Friday, 17. May 2024
|
|